Your house storey addition company in Geneva
Adding a storey to your house in Geneva
Your single-storey or two-level house is no longer enough and you care about your garden. Adding a storey replaces the current roof with a complete level, topped with a new roof. Entreprise du Bâtiment MS SA runs this site in Geneva, from the removal of the old roof timbers to the painting of the new bedrooms.
The answer to whether your house can take another floor comes from two people, the appointed civil engineer for the structure and the qualified representative for the building rules. We organise their involvement before drawing up a detailed quote.
What we carry out
Our team takes on the demolition, the masonry and the interior fit-out of the new floor. The roof timbers, the roofing, the scaffolding, the windows and the technical installations are carried out by our partner companies, which we coordinate.
- Removal of the roof and of the old ceiling in stages
- Levelling of the wall tops and concrete ring beam
- Walls of the new floor in brick or timber frame
- Stair opening and staircase to the level created
- Partitions, linings and plaster ceilings
- Tiled bathroom upstairs
- Parquet in the bedrooms and painting
How we work
The engineer first has the foundations explored and checks the ground-floor walls. On those drawings, we set the construction method of the new floor and the order of operations, then we hand over our quote.
After the permit, the scaffolding is erected and the roof removed by our partners. We level the wall tops and pour the ring beam, then the walls of the new floor go up. The carpenter and the roofer close the volume straight away. Until the roof is on, the floor above the ground level is sheeted every evening. The interior is then completed in the dry.
Specific features in Geneva
We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. In the residential house zone, the height of the building and the total habitable area are regulated, and the added floor enters into this calculation just like the ground floor.
One more floor changes the sunlight and the views of the neighbouring plots. In neighbourhoods of closely built houses, we advise presenting the project to the neighbours before filing. During the open-roof phase, many families choose to stay elsewhere.
What helps us prepare your quote
- The drawings of the house and the approximate year of construction
- The number of bedrooms and bathrooms wanted upstairs
- Photos of the four façades and of the loft
- The nature of the walls and floors if you know it
- The possible position of the future staircase
- Whether you intend to stay on site during the works
Frequently asked questions
Can my 1960s house take an additional storey?
Age does not tell everything. Some old houses have thick walls and good foundations, others do not. Only exploratory openings and the calculation of the appointed civil engineer can answer.
Can the ground-floor ceiling be kept during the works?
When the loft floor is strong enough, it becomes the floor of the new level and the ground-floor ceiling stays in place. Otherwise, it is reinforced or replaced according to the engineer’s drawings.
Will the new roof look like the old one?
We do not impose it. Pitched roof or flat roof, the choice is made with the representative according to the neighbourhood, then the partner roofer or waterproofing contractor builds it.
Where should the staircase go?
Preferably above a corridor or an entrance hall, so as not to sacrifice a ground-floor room. We study several positions on your plan.
No-obligation quote
Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.