Skip to content
Once the permit is granted, a single contact person coordinates all trades.+41 79 557 14 50
Logo Entreprise du Bâtiment MS SAe-surelevation.ch

Building upwards when land is scarce

Adding storeys to houses and buildings in Geneva

In Geneva, open ground is rare and a garden has value. Building upwards means creating rooms or dwellings above what exists, without taking a single metre of land. Entreprise du Bâtiment MS SA adds storeys to houses and apartment buildings in the City of Geneva and in the 45 municipalities of the canton.

One more floor weighs on walls and foundations that were not designed for it. Every project therefore relies on the study of an appointed civil engineer and, almost without exception, on a building permit. We bring these parties together, then we run the site with our team and our partner companies.

No-obligation quote Call +41 79 557 14 50

What adding a storey covers

The term covers several works of a different nature. Some add a complete level, others make the volume under the roof habitable or change the shape of the roof to fit rooms into it.

  • Complete additional storey on a house
  • Additional storeys on a residential building
  • Partial floor above a garage or a low wing
  • Loft conversion
  • Roof alteration, raising and dormers
  • Reinforcement of the existing structure
  • Creation of dwellings and staircase to the new floor

How we work

A storey addition takes a long time to prepare and is built quickly, because the building is exposed to rain until the new roof is on.

  • First meeting on site, where you describe your project to us
  • Feasibility study with a qualified representative and an appointed civil engineer
  • Exploratory openings and survey of the existing structure
  • No-obligation quote, based on the engineer’s drawings
  • Building permit application
  • Scaffolding, removal of the roof and temporary protection by our partners
  • Construction of the new floor, roof, then interior fit-out

Structure first

Before drawing bedrooms, we need to know what the building can carry. The appointed civil engineer, from a partner firm, examines the foundations, the load-bearing walls and the floors, with exploratory openings if needed. The conclusion may be a direct addition, a lightweight addition in timber or prior reinforcement. Our company does not employ engineers, it builds what these calculations prescribe.

The constraints of adding a storey in Geneva

We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. The permitted height depends on the zone and on the position of the building in relation to the street and the neighbours. In protected areas, the heritage departments give their opinion. We cannot prejudge any decision, and the site only opens after the permit.

In town, the scaffolding and the crane occupy the pavement or the roadway, which requires permissions requested in advance. Residents often stay in the building, neighbours see their view change, and the property manager or the condominium wants to be kept informed. Once the permit has been obtained, a single contact person on our side keeps the partners’ schedule and answers the occupants.

Who does what on site

Our masons, plasterers, painters, tilers and parquet layers belong to our own team. They remove what has to be removed, raise the walls, pour the small concrete works and finish the rooms. The roof timbers, the roofing, the sheet-metal work, the waterproofing, the scaffolding, the lifting, the windows and all technical installations are carried out by our partner companies, which we coordinate.

Our trades in Geneva

Frequently asked questions

Can every building take an additional storey?

No. The structure must be able to take the loads, directly or after reinforcement, and the rules of the zone must allow the additional height. The feasibility study answers these two questions before any outlay on site works.

Is a building permit necessary to add a storey?

Yes, an additional storey changes the envelope of the building and goes through a permit application. The qualified representative compiles the file, the cantonal authority decides.

What happens when it rains and the roof has been removed?

Removal is planned in sections and the top floor is protected by sheeting or a temporary roof installed by our partners. We follow the weather closely during this phase.

Do we have to leave the home during the works?

In a house, temporary accommodation elsewhere is often preferable during the phase when the roof is open. In an apartment building, the residents of the lower floors generally stay at home, with protection and information measures.

On what basis do you draw up the quote?

On a visit, on your explanations and on the first elements provided by the engineer and the representative. The quote is without obligation and distinguishes the works of our team from those of the partners.

No-obligation quote

Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.