Skip to content
Once the permit is granted, a single contact person coordinates all trades.+41 79 557 14 50
Logo Entreprise du Bâtiment MS SAe-surelevation.ch

Your floor addition company in Geneva

Adding a floor above part of the house in Geneva

Not all of the house needs to go up. Often a garage, a single-storey wing or a former flat-roofed extension offers a base on which to place one or two rooms. Entreprise du Bâtiment MS SA builds these partial floors in Geneva, easier to live through than a complete storey addition since the main roof stays in place.

The low part was nevertheless built to carry a roof, not inhabited rooms. The appointed civil engineer checks its walls, its slab and its foundations. As the outline of the house changes, a building permit has to be applied for.

No-obligation quote Call +41 79 557 14 50

What we carry out

Masonry, openings and finishes fall to our team. The roof of the new floor, its waterproofing, the windows and the connection to the heating are carried out by our partner companies.

  • Bedroom or office above the garage
  • Upper floor on a single-storey wing
  • Room on a former flat-roofed extension
  • Cutting a door into the wall of the existing upper floor
  • Raising the walls and supports of the new slab
  • Joining of the façades, render and surrounds
  • Floors, plastering and painting of the room created

How we work

We first look at how the new room will be entered. If the house already has an upper floor, a door cut from the landing or from a bedroom is enough. Otherwise, a staircase has to be created and the project changes scale.

Once the permit has been issued, the roofing of the low part is removed and its upper floor reinforced or replaced according to the calculations. We build the walls, our partners fit the roof and the windows, then we open the passage to the house. This opening comes last, when the new volume is closed.

Specific features in Geneva

We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. Garages are frequently built close to the property boundary, sometimes thanks to a rule that only applies to low constructions. Giving them an upper floor is therefore not always accepted, and the representative checks this first.

In semi-detached houses, the low wing often touches the neighbour’s. The height of the new wall on the boundary and the drainage of roof water are settled with the neighbour.

What helps us prepare your quote

  • The plan of the house and of the part to be raised
  • The use of the future room
  • Photos of the garage or wing, inside and out
  • The distance between this part and the edge of the land
  • The current type of roof on the low part
  • The place from which you would like to reach the new floor

Frequently asked questions

Can the walls of my garage carry a bedroom?

Walls in brick or concrete on real foundations often can, a light or prefabricated garage rarely. The appointed civil engineer decides after examination.

Is insulation needed between the garage and the room above?

Yes, as the garage is not heated, the floor of the new room receives thermal insulation and fire protection defined in the project.

Does the site prevent us from living in the house?

No, that is the advantage of a partial floor. The main roof is not touched and the inconvenience is limited to noise and the final opening.

Can a terrace be planned on what is left of the flat roof?

It is possible if the slab allows it. The waterproofing and the railing are then fitted by partners, and the terrace appears in the permit application.

No-obligation quote

Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.