Adding a storey, the questions we are asked
Adding a storey raises questions that come up on no other site. We answer them here in general terms, without replacing the feasibility study, which alone is valid for your building.
How can I know whether my building can carry one more floor?
By examining its foundations, its load-bearing walls and its floors. The appointed civil engineer consults the original drawings when they exist, has exploratory openings made and compares the new load with what the structure can take. That conclusion steers the whole project.
What can be done if the structure is not sufficient?
There are three routes. Lightening the new floor by building it in timber, reinforcing certain load-bearing elements, or reducing the scale of the addition. The engineer compares these solutions and we quote them.
Who decides on the permitted height?
The rules of the zone and the position of the building, applied by the cantonal authority. The qualified representative analyses them at the start of the study. We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client.
Can the neighbours object to an additional storey?
The permit application is published and the persons concerned can put forward their observations under the procedure provided. A direct exchange with the neighbours before filing often helps to ease concerns about views and sunlight.
How long does the building stay without a roof?
We give no duration before having the construction drawings. The principle is to reduce this phase to what is strictly necessary, by preparing the roof timbers or the elements in the workshop and by protecting the top floor between each stage.
Do the tenants stay in the building?
Generally yes for the floors that are not directly under the site. The top level is the most exposed, and its situation is settled between the owner, the property manager and the tenants before the works begin.
In a condominium, who can launch a storey addition?
The roof and the structure are common parts. The deed of constitution and the rules say who holds the right to build upwards and how the owners’ meeting decides. These points should be clarified with the administrator before commissioning a study. At the administrator’s request, we can present the principle of the works to the meeting, so that everyone understands how the site will run and its effects on life in the building.
Adding a storey in masonry or in timber?
Masonry naturally continues solid walls and offers good thermal mass. Timber, erected by a partner carpenter, weighs less and is installed quickly. The choice often falls to the engineer, according to the bearing reserve of the building.
What becomes of the stairwell and the lift?
The staircase must be extended to the new floor and, in an apartment building, the lift can be extended by a partner lift company if the shaft allows it. These extensions are drawn from the study stage, because they take up room on every level.
Do the technical installations follow?
The water risers, the waste pipes, the ventilation, the heating and the electricity are extended by our partners. The existing boiler or heat pump is checked to find out whether it is sufficient for the added area. When it is reaching the end of its life, the storey addition is a good moment to replace it, since the roof and the ducts are open anyway.
In which season should a storey be added?
The removal of the roof and the erection of the new floor are preferably planned for the fine season. Interior works then follow whatever the weather. As the date depends on the permit and on the manufacture of the roof timbers, we only fix the calendar with you when these two elements are known.
Can we take the opportunity to redo the façade?
With the scaffolding in place, it is a logical occasion to insulate or refresh the façades, works carried out with our façade partners. They then appear in the same permit application. The render of the new floor and that of the existing levels can thus be matched, which avoids the effect of an added-on volume.