Your structural reinforcement company in Geneva

Structural reinforcement before a storey addition in Geneva

When the engineer concludes that the building cannot take a floor as it stands, the project does not stop there. Certain load-bearing elements can be reinforced to carry the new loads down to the ground. Entreprise du Bâtiment MS SA carries out these reinforcements in Geneva, on houses as well as on apartment buildings.

Let us be clear about the roles. The diagnosis, the choice of solution and the calculations belong exclusively to the appointed civil engineer. We build the masonry and small-scale concrete works, and we coordinate the partner companies for the special works.

No-obligation quote Call +41 79 557 14 50

What we carry out

Our team takes care of localised demolition, masonry and small concrete works. Steel sections, underpinning, micropiles and large slabs are carried out by our specialised partner companies.

  • Jacketing or thickening of a load-bearing masonry wall
  • Creation of reinforced concrete piers and beams
  • Ring beam at the head of the walls
  • Local widening of a foundation footing
  • Bedding of the supports of steel beams installed by a partner
  • Filling in of old openings that weaken a wall
  • Making good of plaster and floors after the work

How we work

We first make the exploratory openings requested by the engineer, at the foot of a wall, in a floor or behind a lining, then we close them neatly. The reinforcement drawings then reach us with a precise order of execution.

Reinforcements are done from the bottom upwards and always before the roof is removed. Each element is propped during the work, and the engineer checks the reinforcing bars before concrete is poured. The inhabited rooms concerned are protected, partly emptied, then made good by our plasterers and painters.

Specific features in Geneva

We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. The reinforcements form part of the storey addition project and are described in the same drawings.

Geneva’s building stock is very varied, rubble stone walls in village houses, brick and timber floors in the apartment buildings of the early last century, concrete in post-war constructions. The reinforcement method changes with each, and in an occupied building it is limited as far as possible to the cellars, the common parts and the façades.

What helps us prepare your quote

  • The engineer’s report or first conclusions
  • The original structural drawings, when they exist
  • The period when the building was constructed
  • Photos of the cellars and of the load-bearing walls
  • The premises that can be vacated during the work
  • The storey addition project that the reinforcement is to serve

Frequently asked questions

Is reinforcement necessary for every storey addition?

No. Many buildings have a sufficient reserve for a light floor. The appointed civil engineer determines this, and sometimes a simple ring beam on the walls is enough.

Is work needed inside inhabited dwellings?

We first look for solutions that go through the cellars, the stairwell or the outside. When an interior wall has to be reinforced, the work is planned room by room with the occupants.

Who checks that the work is properly done?

The appointed civil engineer comes to verify the reinforcing bars and the supports at the stages set in the drawings. We do not pour concrete without that agreement.

Is reinforcing the foundations always possible?

Technically, solutions exist in most cases, carried out by specialised partners. Their scale may however make a lighter storey addition preferable.