Skip to content
Once the permit is granted, a single contact person coordinates all trades.+41 79 557 14 50
Logo Entreprise du Bâtiment MS SAe-surelevation.ch

Your timber storey addition company in Geneva

Adding a timber-frame storey in Geneva

Timber is a material very often chosen for building upwards. A timber-frame floor weighs markedly less than a masonry floor, which spares the existing walls and foundations, and it arrives on site as panels already assembled. Entreprise du Bâtiment MS SA carries out these additions in Geneva with a partner carpenter.

This lightness dispenses with neither the calculation nor the procedure. The appointed civil engineer checks the load path and the anchoring of the floor against wind, and the addition goes through a building permit like any other.

No-obligation quote Call +41 79 557 14 50

What we carry out

We prepare the building to receive the floor and we fit it out once it is in place. The manufacture and lifting of the frame, the roofing, the façade and the windows are carried out by our partner companies, which we coordinate.

  • Removal of the ceilings and of the roof masonry
  • Level wall tops all round the perimeter
  • Concrete ring beam with the anchors specified by the engineer
  • Coordination of the lifting days
  • Masonry junction between the old façade and the new floor
  • Linings, partitions and ceilings in plasterboard
  • Floors, tiling of the wet rooms and painting

How we work

While the carpenter manufactures the panels in the workshop, we prepare the top of the walls. The accuracy of the levelling matters, because prefabricated elements cannot be adjusted with a trowel. A joint survey fixes the dimensions before manufacture.

The lifting is the high point of the site. The roof is removed, the wall panels, the floor and the roof are placed by crane and the volume is made weathertight straight afterwards by the partners. We follow on with the interior works, under cover.

Specific features in Geneva

We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. Timber construction meets fire protection requirements that depend on the height of the building, and which the project deals with from the start.

Bringing a crane and a convoy of panels into a narrow street or a residential lane takes preparation. Temporary closure of the street, assembly area, overhead lines of public transport, all this is verified and announced well before the lifting day.

What helps us prepare your quote

  • The drawings of the building and of its current roof
  • The area of the floor you want to create
  • Photos of the street and the surroundings for the lifting
  • The façade covering you want for the new floor
  • The results of any structural study
  • The period that would suit you for the works

Frequently asked questions

Why is timber so frequent in storey additions?

Because it puts little load on the existing structure and shortens the phase when the building is open. These two advantages count particularly on an inhabited building.

Is a timber floor well insulated from noise?

Sound insulation is dealt with through the composition of floors and walls, with decoupled layers and screeds. It is studied by the partner carpenter and completed by our linings.

Can the timber floor look like the remainder of the building?

Yes, render on insulation gives it the appearance of a solid façade. Other owners prefer to mark the addition with cladding or a metal covering.

Can timber and masonry be combined?

It is common. The stairwell and certain cross walls are built in masonry by our team, the remainder of the floor is in timber frame.

No-obligation quote

Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.